We have clients who hav kits with cast in Brackets that want to get their slabs poured before the kit is ordered. Is there any way the cast in brackets can be ordered seperately and supplied direct to the franchise ahead of the rest of the kit so the slab can proceed. this is particulaly relevant where we have build delays and and are want to delay the kit being ordered so it is not sitting on the ground for a lengthy period of time.